
PowerFlex 700L Technical Data
Publication 20L-TD001A 15
Frame 2 Drive
Recommended Mounting Clearances
Specified vertical clearance requirements are intended to be from drive
to drive. Other objects can occupy this space; however, reduced air flow
may cause protection circuits to fault the drive. In addition, inlet air
temperature must not exceed the product specification.
Mounting Requirements
The PowerFlex700L Frame 2 drive is a single integrated assembly
consisting of a filter section and a power section. The filter section
provides the mounting feet and represents greater than 50% of the
approximately 186 kg (410 lb.) total weight.
• The Frame 2 drive should be mounted into an enclosure that is
designed according to Electrical Equipment Pollution Degree 2
requirements.
• Any enclosure mounting panel needs to be sized and fastened
appropriately to accommodate for the weight of the drive.
• The Frame 2 drive is designed to use eight M8 x 1.25 fasteners in
mounting slots shown in Detail A and Detail B of the drawing on
page 12
.
• The M8 x 1.25 fasteners shall be class 5.8 or greater.
• The fasteners shall use a lock washer or similar mechanism to
prevent loosening after mounting.
POWER
STS
PORT
MOD
NET A
NET B
Power Ratings and Branch Circuit Protection - Page 21
Input Power Conditioning - Page 14
EMC Requirements - See PowerFlex 700L User Manual
LCD Human Interface Module - Page 9
Reflected Wave Reduction - Page 9
Cable Recommendations - Page 20
Integral Class 10 Motor Overload
Motor Recommendations -
See Publication MOTORS-CA001
Removable MOV and Caps (underneath cover) - See
PowerFlex 700L User Manual for locations and instructions
(Frame 2 Drive shown)
AC Supply Source Considerations - Page 14
Unbalanced, Ungrounded or Resistive
Grounded Distribution Systems - Page 14
EMC Requirements - Page 14
101.6 mm
(4.0 in.)
101.6 mm
(4.0 in.)
101.6 mm
(4.0 in.)
101.6 mm
(4.0 in.)
101.6 mm
(4.0 in.)
Frame 2 Drive Clearances
Comentarios a estos manuales